Development

After more years than we can remember, development has suddenly taken off at the PBR, to the extent that our volunteers are now working flat out.

Why is this:

  • We are a railway with a rapidly growing profile – nothing succeeds like success
  • A very large fraction of our membership are active volunteers, to an extent that would make very many larger railways green with envy
  • The statutory funders have woken up to the fact that we are making an increasing impact on the tourism product in Blaenavon, and that we are not going to go away
  • We have the most extraordinarily generous members who have added to the small amount we get from public donations with very substantial donations of their own

So why these pages? Quite apart from the fact that your webmaster has had his arm twisted, we are all very proud to be eveloping at the rate we are. We hope you will be able to share our enthusiasm and match our member’s generosity, either by joining us as a member, or by chipping in with a donation. Naturally we‘d like to hear from any passing philanthropic millionaires that might to be passing, but if you are not a millionaire, but would simply like to be labelled a philanthropist then a small donation would be very welcome.

If you’d like to make a donation, AND the opportunity to reduce the amount of tax that the tax man takes from you (and who wouldn’t), then click HERE. This will download our appeal form as a PDF document.

On the other hand, quite the best way of helping the railway is to set up a regular Standing Order, and for that purpose you will need a mandate form, which can be downloaded from HERE This will also download the mandate form as a PDF document.

Enough of the begging! Development on this railway is not haphazard or opportunist, but has arisen from years of careful planning. This is not as virtuous as it sounds, when you have had as much time to plan as we have! So this page will say something of our plans but will expand with news items as the various plans take off and progress towards completion.

Because development has become a BIG issue, and is likely to remain so for some years to come, we have divided this section into a number of pages. You can navigate to these pages from here. Before you do so, we invite you to read the page which outlines our overall plans. If, on the other hand, you know what we are doing, and just want to get an update on progress then one of the other ‘topic’ pages, will be the place to go. The number of topic pages is likely to increase, and when the work it describes is completed, it will remain as a record of what we have done and how we did it. Although this web site is primarily for public viewing, some of our members like to see the ins and outs of their work, and even their own faces! For this reason, some of the pages may be a little too detailed for easy viewing by the public – we apologise in advance for this!

The Overall Plan is HERE (uploaded 4 July 2008)

Pictures and stories from the following areas will be uploaded over the coming months. Several areas will be featured in the next few days, though some pages may be little more than a placeholder with, perhaps just one illustration.

Step and description or work Select page Status First uploaded Last updated
1.1 Water and sewerage HERE Complete 12 Nov 2008
1.2 Extension to Blaenavon (High Level) Funded
1.2.1 Trackwork
1.2.1.1 Trackwork – Furnace Sidings to Forgeside

Page 1 - HERE

Page 2 - HERE

Page 3 - HERE

Page 4 - HERE

Page 5 - HERE

Page 6 - HERE

Page 7 - HERE

Complete

2 Nov 2008

2 Nov 2009

2 Feb 2009

21 Sep 2009

22 Nov 2009

18 May 2010

24 May 2010

22 Apr 2009

14 Oct 2009

1.2.1.2 Trackwork – Forgeside to Blaenavon (High Level)
1.2.2 Fencing

HERE

In progress

20 May 2010

1.2.3 Platform at Blaenavon (High Level)

Page 1 - HERE

Page 2 - HERE

Complete

15 Nov 2008

26 Nov 2008

13 April 2009
1.2.4 Bridges
1.2.4.1 Old Pit Road Bridge (Bridge 13) HERE Complete 24 Oct 2008

10 Mar 2009

1.2.4.2 New Pit Road Bridge (Bridge 14)

HERE

Complete

28 Oct 2008

18 May 2010
1.2.4.3 Cycletrack Low Bridge (Bridge 16) HERE Complete

28 Oct 2008

1.2.4.4 Stream Bridge (Bridge 17) HERE Complete

14 Nov 2008

9 Jan 2009

1.2.4.5 Forgeside Road Bridge (Bridge 18) HERE Not scheduled 17 Nov 2008
1.2.4.6 Varteg Road Bridge (Bridge 19) HERE

In progress

14 Nov 2008 25 Jan 2011
1.2.5 Ecological assessment along the route HERE Complete
1.2.6 Rail over rail Bridge (Bridge 12)
1.2.6.1 Repair of Bridge 12 to permit trains UNDER Complete
1.2.6.2.Repair of Bridge 12 to permit trains OVER HERE Complete 26 April 2009

28 Nov 2010

1.3 Infrastructure improvements at Furnace Sidings
1.3.1   Construction of second platform at Furnace Sidings

Page 1 - HERE

Page 2 - HERE

Complete

23 Oct 2008

23 Oct 2008

1.3.2   Erection of footbridge between platforms 1 and 2 at Furnace Sidings

Page 1 - HERE

Page 2 - HERE

Complete

24 Oct 2008

22 Oct 2010

12 June 2010

1.3.3   Construction of a comprehensive station building on platform 1, Furnace Sidings .

Page1 - HERE

Page2 - HERE

In progress

15 April 2009

22 Feb 2011

1.4 – Infrastructure improvements at Blaenavon (High Level)
1.4.1 - Construction of suitable buildings

Page 1 - HERE

Page 2 - HERE

Page 3 - HERE

In progress

17 June 2009

23 Nov 2009

6 Jan 2010

23 Sept 2009
1.4.2 - Construction of a run-round loop

No funds

1.4.3 – Construction of a second platform

HERE

Started,

but not funded

13 Oct 09
1.4.4 - Erection of  footbridge No funds
1.5 - Big Pit branch HERE 3 May 2009
1.5.1 Carriage shed and visitor centre Forms part of a separate HLF application
1.5.2 Branch line to Big Pit - track laying and modifications to existing trackwork In progress
1.5.3 Construction of simple station near Big Pit

In design

1.5.4 Acquisition and adaptation of suitable passenger carrying vehicles Not yet funded
1.5.5 Provision of suitable motive power

Complete

1.5.6 Stock shed on Up Exchange Sidings Deferred
1.6 - Extension to Top Shed HERE

In progress

13 Oct 2009 26 Jan 2011
1.7 - Fencing around Down Exchange Sidings Complete